NO | TAJUK | TARIKH BUKA | TARIKH TUTUP | KENYATAAN TAWARAN |
TENDER MEMBEKAL, MENGHANTAR, MEMASANG, MENGUJILARI DAN MENTAULIAH PERALATAN MESIN DAN PERALATAN BENGKEL BAGI KEGUNAAN DI BENGKEL-BENGKEL JABATAN KEJURUTERAAN MEKANIKAL POLITEKNIK KUCHING SARAWAK | 09 APRIL 2025 (RABU) | 30 APRIL 2025 (RABU) | MUAT TURUN | |
PKS.S.400-2/12/2/132 | TENDER PERALATAN SISTEM RANGKAIAN KAMPUS (WIFI) DALAM MENYOKONG PEMANTAPAN INSFRASTRUKTUR ICT KE ARAH PENDIGITALAN PENDIDIKAN TINGGI FASA 2 PERKABELAN SISTEM RANGKAIAN KAMPUS DI POLITEKNIK KUCHING SARAWAK | 15 APRIL 2025 (SELASA) | 12 MEI 2025 (ISNIN) | MUAT TURUN |
PKS.S.400-2/12/2/138 | SEBUT HARGA KERJA-KERJA MENAIKTARAF LAMPU JALAN UTAMA DI SEKITAR POLITEKNIK KUCHING SARAWAK | 25 MAC 2025 (SELASA) | 07 APRIL 2025 (ISNIN) | TUTUP |
NO | TAJUK | TARIKH PELAKSANAAN | PEMBEKAL/KONTRAKTOR BERJAYA |
PKS.S.400-2/12/2/105 | SEBUT HARGA KERJA-KERJA PENYELENGGARAAN DAN MEMBAIK PULIH SISTEM PENDAWAIAN KECIL SERTA PERALATAN ELEKTRIK DI POLITEKNIK KUCHING SARAWAK. | 27 Mei 2024 Sehingga 18 Ogos 2024 | RAMADHAN CONSTRUCTION AND ELECTRICAL WORKS |
PKS.S.400-2/12/2/113 | SEBUT HARGA KERJA-KERJA MENAIK TARAF DAN PENYELENGGARAAN SISTEM PEMBENTUNGAN DAN LOJI RAWATAN KUMBAHAN SERTA KERJA BERKAITAN DI POLITEKNIK KUCHING SARAWAK. | 15 Julai 2024 Sehingga 12 Oktober 2024 | SYARIKAT NURAAMAS JAYA SDN BHD |
PKS.S.400-2/12/2/114 | SEBUT HARGA KERJA-KERJA PENYELENGGARAAN BUMBUNG TERMASUK STRUKTUR, SILING, GUTTER DAN PAIP LIMPAH HUJAN SERTA KERJA-KERJA BERKAITAN DI POLITEKNIK KUCHING SARAWAK. | 15 Julai 2024 Sehingga 14 November 2024 | WEFAN CONSTRUCTION |
PKS.S.400-2/12/2/112 | SEBUT HARGA KERJA-KERJA MENAIK TARAF SISTEM PENCEGAHAN KEBAKARAN SERTA KERJA- KERJA BERKAITAN DI POLITEKNIK KUCHING SARAWAK. | 15 Julai 2024 Sehingga 12 Oktober 2024 | SYARIKAT AMAN SEROJA |
Accessibility Toolbar